Will NCT05531656 (Cognition Therapeutics) still show a study completion date of 31 May 2027 or earlier when checked on 30 June 2027?
deadline 2027-06-30
confidence medium
tier 4 evidence
72%PolySignal estimate
Resolution criterion
Yes if, when NCT05531656 is read on clinicaltrials.gov on 30 June 2027, the exact API field protocolSection.statusModule.completionDateStruct.date — Study Completion Date is 31 May 2027 or earlier — that is, the date announced today has not been pushed back. A later recorded date counts as no. If OverallStatus is Terminated, Withdrawn, Suspended, or Unknown status, that counts as no — an unmaintained or halted record is treated as a failure to hold the date, not as a technicality. The value returned by the ClinicalTrials.gov API on the deadline prevails; where the record gives a month without a day, the last day of that month is used.
Verified starting state
As of 28 September 2026: NCT05531656 is registered as ACTIVE_NOT_RECRUITING, sponsored by Cognition Therapeutics, with 540 participants. Started 2023-06; announced primary completion 2027-05-31, announced study completion 2027-05-31. Record last updated 2026-08-10. The date under test is 2027-05-31. Source: clinicaltrials.gov/study/NCT05531656
What pushes it up
- The trial status is ACTIVE_NOT_RECRUITING with all 540 participants enrolled, eliminating recruitment bottlenecks which are the primary driver of trial delays [1].
What pushes it down
- Alzheimer's disease clinical trials still face risk of protocol updates, data management locks, or follow-up delays that could extend the study completion date beyond May 31, 2027 [1].
What would move this number most
Whether participant follow-up visits and final data collection stay strictly on schedule without protocol amendments.
How this number is built
| Deadline | 2027-06-30 |
| Base rate | 75% |
| Best evidence | tier 4 · 0 article(s) used |
| Independent runs | 68 · 75 (spread 7 pts) |
| Confidence | medium |
| Evidence cap | not triggered |
| Last revised | 2026-09-28 00:16 |
| Model | gemini-3.6-flash |