Medicine · Français

Will NCT06693895 (GlaxoSmithKline) still show a study completion date of 23 November 2026 or earlier when checked on 23 December 2026?

deadline 2026-12-23 confidence medium tier 4 evidence
30%PolySignal estimate

Resolution criterion

Yes if, when NCT06693895 is read on clinicaltrials.gov on 23 December 2026, the exact API field protocolSection.statusModule.completionDateStruct.date — Study Completion Date is 23 November 2026 or earlier — that is, the date announced today has not been pushed back. A later recorded date counts as no. If OverallStatus is Terminated, Withdrawn, Suspended, or Unknown status, that counts as no — an unmaintained or halted record is treated as a failure to hold the date, not as a technicality. The value returned by the ClinicalTrials.gov API on the deadline prevails; where the record gives a month without a day, the last day of that month is used. If that exact field is absent or empty on an otherwise existing record, that also counts as no – a missing date is not evidence the deadline will be met, it is treated the same as a halted record.

Verified starting state

As of 6 October 2026: NCT06693895 is registered as RECRUITING, sponsored by GlaxoSmithKline, with 750 participants. Started 2024-11; announced primary completion 2026-11-23, announced study completion 2026-11-23. Record last updated 2026-05-29. The date under test is 2026-11-23. Source: clinicaltrials.gov/study/NCT06693895

What pushes it up

What pushes it down

What would move this number most

Whether recruitment was completed ahead of schedule or if GSK will update the registry with an extended timeline before the December 2026 check date.

How this number is built

Deadline2026-12-23
Base rate35%
Best evidencetier 4 · 0 article(s) used
Independent runs28 · 32 (spread 4 pts)
Confidencemedium
Evidence capnot triggered
Last revised2026-10-06 07:41
Modelgemini-3.5-flash