Medicine · Français

Will NCT06998524 (Hoffmann-La Roche) still show a study completion date of 30 April 2029 or earlier when checked on 30 May 2029?

deadline 2029-05-30 confidence medium tier 4 evidence
34%PolySignal estimate

Resolution criterion

Yes if, when NCT06998524 is read on clinicaltrials.gov on 30 May 2029, the exact API field protocolSection.statusModule.completionDateStruct.date — Study Completion Date is 30 April 2029 or earlier — that is, the date announced today has not been pushed back. A later recorded date counts as no. If OverallStatus is Terminated, Withdrawn, Suspended, or Unknown status, that counts as no — an unmaintained or halted record is treated as a failure to hold the date, not as a technicality. The value returned by the ClinicalTrials.gov API on the deadline prevails; where the record gives a month without a day, the last day of that month is used. If that exact field is absent or empty on an otherwise existing record, that also counts as no – a missing date is not evidence the deadline will be met, it is treated the same as a halted record.

Verified starting state

As of 6 October 2026: NCT06998524 is registered as RECRUITING, sponsored by Hoffmann-La Roche, with 75 participants. Started 2025-06; announced primary completion 2027-04-30, announced study completion 2029-04-30. Record last updated 2026-09-09. The date under test is 2029-04-30. Source: clinicaltrials.gov/study/NCT06998524

What pushes it up

What pushes it down

What would move this number most

Whether the trial can successfully complete recruitment of its 75 participants on schedule by the primary completion date of April 2027.

How this number is built

Deadline2029-05-30
Base rate30%
Best evidencetier 4 · 0 article(s) used
Independent runs30 · 38 (spread 8 pts)
Confidencemedium
Evidence capnot triggered
Last revised2026-10-06 07:39
Modelgemini-3.5-flash